Coastal Utility
COASTAL UTILITY SOLUTIONS
About Coastal Utility

Built by the best
for the best.

Coastal Utility was founded by President (Anthony Herrera) and Vice-president (Tracy Herrera) and believe in building the future that will last and a road to long standing infrastructure, and we have confidence in our work because we take time to plan and build and make sure our work is not only spec satisfactory but better.

From underground HV cable runs to full substation construction, our crews are factory-trained, IBEW-affiliated, and led by superintendents who came up through the same hooks.

Coastal Utility field team

How we run a tight job site.

01

Safety as discipline

Zero-incident culture rooted in pre-task briefings, switching orders, and continuous training for every lineman in the field.

02

Jobsite Prep and Job Planning

Every project starts with Intense planning and prep from job walks and site planning such as logistics and prep for equipment and being ready for any challenge that might be in the way.

03

On time. On budget. On record.

We document every weld, splice, and termination. Our handoff packages are audit-ready on day one.

Let's talk scope.

If you have a high-voltage project on the boards, our estimators can walk it with you.

Request a Bid →